WP 6 Projections

Lead beneficiary: NORCE

Workpackage leader: Jörg Schwinger

Workpackage co-leader: Laurent Bopp

1. To provide scenario projections with an ensemble of ESMs for the 21st to 23rd centuries, provide non-standard (e.g. high frequency) output for the project.
2. To investigate the robustness of ESM projections with respect to mitigation metrics developed in WP5 and to constrain the ensemble of ESM projections better with respect to abrupt changes of oxygen concentration, acidification, and biomass production.
3. To run selected mitigation scenarios in an ensemble of ESMs. To synthesize results from standard and mitigation scenario runs from WP 5 and 6.